DAVIDYEK
  • Home
  • About
    • Professional Registration
    • Qualifications
    • Engagements
    • Private Practice
    • SIF Fellows
  • Practice
    • Our Approach >
      • S:Scale [Artefacts]
      • M:Scale [Building]
      • L:Scale [Urban]
    • Large Projects >
      • Highrises >
        • SSM International School
        • JBio
        • UKIH
        • Vertigo Residency
        • Diorama
        • Resi-Hub
        • SunMed
        • Medini
        • Palmspring Damansara
        • Blink
      • Lowrises >
        • Data Center
        • Garden Homes
        • XIN
        • Albient
        • Hillcourt
    • Small Projects >
      • Rustic Raphsody
      • MCM >
        • Estate House
        • Uniform Annex
        • Kitchen Extension
        • Sixth Form Center
      • Putrajaya Boulevard >
        • LOO
        • BOO
        • DOO
        • 5 Elements Tower
      • Detached Houses >
        • Batu Residence
        • Malaqa Residence
        • ParkCity Residence
        • Sierramas Residence
      • Commercial >
        • Albion Club
        • QuanYuan
        • Nippon Go
    • Interior Designs >
      • Spartan Minimalism
      • Neo Retro
      • Reflective Modern
    • UBBL 1984
    • Newsletter
  • DYA + C
    • Our CV
    • Adjudication >
      • CIPAA Procedure >
        • Scope of CIPAA
    • Arbitration >
      • Appointment of Arbitrator >
        • Terms of Appointment >
          • Preliminary Meeting Agenda
      • PAM Arbitration Procedure
      • Arbitration Costs Breakdowns >
        • Drawdown
      • Award Writing Blog >
        • Expert Evidence in Arbitration
    • Mediation >
      • Appointment of Mediator
      • Mediation Process
      • Skill Set Lev 01 & 02
    • Expert Determination >
      • Expert Rules - PAM
      • Expert Determination Processes
    • Building Inspection Services
    • Courses & Training >
      • Contract Administration
    • ADR & Construction Law
  • Consultant
    • QuanYuan 泉緣 Story
    • Review
    • QuanYuan >
      • Why QuanYuan?
      • Modus Operandi
      • Consultancy Services
    • Our Lineage
    • Workshop >
      • Teacher's Profiles
      • Message
      • SanYuan 01 - Introduction
      • Community
      • Registration of Interest
    • QiMen DunJia 奇門遁甲 >
      • QMDJ - Shifting Palace
    • Audit & Cases >
      • Cases - REA Hotel
      • Cases - Childless Couple
      • Cases - Childless Couple 02
    • Yifengshui
    • Newsletter >
      • MBS FengShui Reinvestigated
    • FAQ
    • E-Store
  • Educator
    • Author I am...
    • Speaking Engagement >
      • International Contract
      • PAM cpd UNLIMITED 2.0
      • Arch Edu Practice Paper - 3Ds Pedagogy
    • Attempting Law School
    • Journey in USM(Arch) >
      • Thesis >
        • Site Analysis
        • Urban Design Approach
        • Sketch Design
        • Model Based Paradigm
        • Technical Studies
      • Studio 01
      • Studio 02
    • Discourse in Studio 6 >
      • Ideation
      • The Production Model >
        • The Actors
        • The Stage
        • Urban Mass
        • The Box
        • The Play
        • The Break
        • The Newsletter
        • The Document
        • The Presentation
    • d:KON 4 >
      • Actors >
        • Chua LiCheng
        • Ng KenHong
        • Sean Tan
        • Peggy Chai
        • Elliotte Teoh
        • Vincent Tow
        • TzeLer
        • Elaine
        • Ng SongChun
        • Carissa Foong
        • Ng WeiMun
        • Ng ChenYin
        • Nicol Ong
        • Adron Liang
        • Ivan Sung
        • Lau HuiJew
      • Acts >
        • Portraiture
        • A Slice of Space Time
        • Box of Installation of Lights
        • Radio Misreading
        • Grid of Destinies
        • Shelter
        • Anatomy of Pain
        • Tensigrity of Ego
        • Of Prisons and Walls
        • Forest of Nails
        • Curtain of Fears
        • Dissolution of the Ego
        • If it's Ain't Broken it's Ain't Worth Mending
        • Flight of Freedom
        • Cross of Complexity and Contradiction
        • interrogation
      • Stage >
        • Soap Box
      • Play
      • Approach
      • Galleria >
        • Martial Gallery
        • Drive Through Gallery
        • Clinique Gallery
        • Cafe Gallery
        • MACC Gallery
        • Haunted Gallery
        • Backpacker Hotel
        • Audio Bookshop Gallery
        • Funeral Parlour
        • Extreme Game Gallery
        • Play Ground
        • Wedding Gallery
        • Meditation Gallery
        • Water Tower
        • Photography Studio
        • Chapel Gallery
    • External Critique >
      • Discourse in Sem 06
      • Discourse in Sem 05 >
        • The Site - KB
        • The Rectilinear
        • The Paired Kidneys
        • The Boat
        • The Decepticon
        • The Curvature
      • EnviroDesign MasterClass 2015
    • Philosophy
    • Codes Regulations & Standards >
      • Building Codes
      • Fire Codes
      • QAQC & Building Inspection
      • Critics
  • Photo Essays
    • Shanghai
    • Siemreap
  • Contact

SERVING OF NOTICE AND DOCUMENTS IN CIPAA ADJUDICATION – WHERE IS THE NORM NOW?

11/3/2021

0 Comments

 
Picture

​SERVING OF NOTICE AND DOCUMENTS IN CIPAA ADJUDICATION – WHERE IS THE NORM NOW?

UPDATE: On 4 Apr 2022, the AIAC has issued circular 11, prescribing manner of serving notices, adopted for CIPAA 2012. Apparently, s.38(a)-(d),CIPAA 2012, wasn’t that definitive when comes to the recent findings of the courts as in Skyworld Development Sdn Bhd v Zalam Corp Sdn Bhd[1], where delivery of AR-Registered is presumably delivered unless rebutted. Here, the definition of ‘delivery at its ordinary course’ does not imply the ‘date of posting’. Such, sender has to provide ‘sufficient period of time’ for delivery, as in regard to s.38(c), CIPAA 2012: Service by Registered Post. Applying such to serving of Payment Claim, Notice of Adjudication and other Notices including the Decision, the ‘actual receipt’ of such notices is indicated. It is manifested that the AIAC attempted to provide clarity, but it dropped short of specifying what does it mean by ‘sufficient period of time’? Compounded by the absent of clarity as to what it meant by ‘indicate’ and ‘acceptance’ in the Interpretations Act 1948, the burden now, rests squarely on the shoulders of the Adjudicator.    

-----------------------------------------------------
[1] [2019] MLJU 162

Assuming that Claimant had filed a Request to Appoint an Adjudicator and the Adjudicator had proposed his terms of appointment, with only the acceptance by the Claimant agreeing that communication is via email. Respondent has not responded at all. The Adjudicator then emailed and couriered his Notice of Acceptance via Form-6 on the last working day i.e. day-10. The parties would not have possibly receive the physical Form-6 by then.
 
The questions were whether failure of the parties receiving the physical Form 6 within the 10 working days constitute a breach of s.23(2) CIPAA? If so, what constitute the manner of serving of notices?
 
The law holds:
 
S.23(2) CIPAA states, “The adjudicator shall propose and negotiate his terms […] within ten working days from the date he was notified of his appointment, […]”
 
S.38 CIPAA states, “Service of a notice or any other document under this Act shall be […] a) By delivering the notice or document personally […] b) By leaving the notice or document […] during the normal business hours of that party; c) By sending the notice or document […] by registered post; or d) By any other means as agreed in writing […]”
 
The evidence shows:
 
One, there is no mutual acceptance by the parties of the Adjudicator’s terms and communication via email. Thus, method of serving notice or document as prescribed under S.38 CIPAA prevailed.
 
Two, parties would not have possibly received the physical Form 6 within then. So, whether such failure to receive the physical Form 6 constitute a breach of s.23(2) CIPAA? To answer this, can courier services be construed as hand delivery? If so, what constitute hand delivery? Ordinary meaning of courier, is a person or company that takes messages, letters or parcels from one person or place to another.[1]  Whereas, hand delivery is to take something to someone yourself or send it by courier.[2] Therefore, a courier service can be construed as by hand. Thus some insisted that an affidavit be taken by the courier serviceman to affirm that the documents had been served. Implying such, it must be a recorded delivery.
 
Three, parties may have received the document past the ‘normal business hours’. This condition is not warranted with regard to s.38(a). We are not clear who would have been there to receive it past the ‘normal business hours’? S.38(b) holds that document is deemed served ‘by leaving it at the usual place of business’, ‘during normal business hours’. This provision is in contrasts to the HC decision that a ‘day’ as in a ‘working day’ covers 24-hours.[3] Thus, if the documents were couriered within the same working day, duly recorded by statutory affirmation or recorded delivery, it is deemed to have been delivered.
 
Concluding:

Whether failure of the parties to receive the physical Form 6 within the 10 working days period constitute a breach of s.23(2) CIPAA, the short answer is depends on the merits. It is in breach, if the courier is of an unrecorded delivery or with no statutory affirmation, delivered outside the last ‘working day’. It is not a breach if the conditions and merits would had unfold otherwise. What constitute the manner of serving of notices? It is as prescribed by S.38 CIPAA either by hand delivery; leaving at the office during ‘business hour’; or via registered post; or by any other means agreed.
 
Having considered that, assuming the Adjudicator sent the notice by registered post instead of courier, would the ‘postal rule’ applied? What is in the postal rule? The ‘postal rule’[4] and communication via email[5] are commonly applied in contractual transaction. In postal rule, communication deemed to have occurred once the letter has been posted (registered). However, email is not governed by this postal rule.[6] Malaysia has similarly adopted this postal rule via application of the s.4(2)(b) Contract Law 1950.[7] However, can this postal rule also applied in Adjudication?
 
Two contrasting approaches, with regards to ‘postal rule’. As applied observed in the serving of writ of summons via AR-Registered Post, on one hand, there is no provision of law that Plaintiff must prove that the named person had received the writ of summons and statement of claim, being sent by AR-Registered Post, unless rebutted by Defendant.[8] On the other, affidavit of service must prove ‘due service’ of writ of summons and that the lacuna of the Rules of Court 2012 (“ROC”)[9] must be interpreted in favour of the Defendant.[10] This unsettled law was revisited by the courts recently, contemplating whether the acknowledgement of AR-Registered Post receipt card is conclusive proof? The HC and Court of Appeal hold that it was conclusive prove. The FC disagree and went on to say, AR-Registered Post receipt card is not conclusive if the affidavit does not exhibit the receipt card  does not contain an endorsement of receipt by the Defendant or nominee.[11]
 
Adjudication mirrors the conduct of the court. Can the Adjudicator simply drop the notice off at the post office and call it a day? In reflection of Goh Teng Whoo case[12] the short answer is ‘No’. Service by way of AR-Registered Post does not conclusively mean that the recipient has received the same as the AR-Registered Post, continues to be interpreted as ‘service and time’ of service are ‘presumed’ and ‘until the contrary is proven’.[13] We have yet to see this judgement be applied to an Adjudication case.

---------------------------------------------------------------------------
[1] Cambridge Dictionary <https://dictionary.cambridge.org/dictionary/english/courier> accessed 3 Nov 2021
[2] Cambridge Dictionary <https://dictionary.cambridge.org/dictionary/english/hand-deliver> accessed 3 Nov 2021
[3] Skyworld Development Sdn Bhd v. Zalam Corporation Sdn Bhd & Other Cases. [2019] 1 LNS 173
[4] Adams v Lindsell [1818] 1B&Ald.681
[5] S.7.Electronic Communications Act 2000; Neocleous v Rees[2019]EWHC2462(Ch)
[6] Thomas v BPE Solicitors [2010] EWHC306(Ch); Greenclose v National Westminster Bank [2014] EWHC1156(Ch)
[7] Ignatius v Bell (1913) 2 FMSLR 115
[8] Yap Ke Huat & Ors v Pembangunan Warisan Murni Sejahtera Sdn Bhd & Anor [2008] 4 CLJ 175
[9] Order 10 Rule 1(1) ROC
[10] Chung Wai Meng v Perbadanan Nasional Berhad [2017] 1 LNS 892
[11] Goh Teng Whoo & Anor v Ample Objectives Sdn Bhd (Civil Appeal No: 02(i)-35-04/2019(W)
[12] [2021] MLJU 300
[13] S.12 of the Interpretation Acts 1948 and 1967 
0 Comments

    DYA+C

    Author

    DYA+C is set up by Ar. DAVID YEK TAK WAI to undertake resolution of commercial disputes through ARBITRATION and ADJUDICATION, specializing in CONSTRUCTION PAYMENT DISPUTES.

    This is an educational blog. We do not guarantee, confirm nor warrant the accuracy of the information and facts stated therein. Read at your own 'risk'.

    Archives

    December 2022
    November 2021
    October 2021
    September 2021
    May 2021
    April 2021
    March 2021
    January 2021
    December 2020
    November 2020
    October 2020
    September 2020
    June 2020
    May 2020
    April 2020
    October 2019
    September 2019
    August 2019
    April 2019
    December 2018

    Categories

    All
    AALCO
    Acific Associates V Baxter [1989]2AllER159
    ACP
    Act Of Criminal
    Ad Hoc Mediation
    Adjudication
    AIAC
    AIAC Form
    Arbitration
    Arbitration Conference 2018
    Arenson V Casson Beckman Rutley [1977]AC405
    Art 121 Federal Constitution
    Art7(ad)PAM2006
    Art.7 PAM 2006
    Bellefield Computer Services V E. Turner & Sons Ltd (No. 2) [2002]
    Bettini V Gye (1876)
    Bias
    Bills Of Quantities BQ
    Blakemores LDP (in Administration) V Scott And Others [2015]
    Board Of Architect Malaysia LAM
    Cadenvish Case UK
    Canary Wharf V. EMA [2019]
    Caparo Industries V Dickman [1990]
    Carillion Collapsed
    CCC
    Certifier
    CFO
    Chambers V Goldthorpe [1901]
    Chitty On Contracts
    CIArb
    CIDB
    CIDB Form
    CIMB Bank Bhd V Anthony Lawrence Bourke & Anor [2019]
    CIPAA
    Clause 1.4
    Clause 18
    Clause 2.0
    Clause 21.4
    Clause 23.10
    Clause 23.1(a)
    Clause 23.5(b)
    Clause 23.8(a)
    Clause 23.8(w)
    Clause 24.1(b)
    Clause 24.3(c)
    Clause 24.3(n)
    Clause 2.(a)
    Clause 3.1
    Clause 4.1
    Clause 4.3
    Clause 7.1
    Confidentiality
    Construction Law
    Contract Administration
    CPC
    Cubic Electronic Vs Mars Telecommunications
    Defect Liability
    Delay
    Disclosure
    Discrepancy Dwgs-Bills
    Dispute Clause
    Drawings
    Dysfunctional Arbitration Agreement
    EOT
    Evaluative Mediation
    Ezumi
    FIDIC Form
    Final Costs
    Fong Wan Reality V PJ Condominium S/B [2010]
    Force Majeure
    Fraudulent Misrepresentation
    Frustration
    Goh Teng Whoo & Anor V Ample Objectives
    Good-Faith
    Guan Aik Moh (KL) Sdn Bhd & Anor V Selangor Properties Bhd [2007]
    Hadley V Baxendale [1854]
    Halliburton V Chubb [2020]
    Haward And Others V Fawcetts (a Firm) [2006]
    HDA
    HGCRA
    Hong Kong Fir Shipping V Kawasaki Kisen [1962]
    IEM Form
    Immunity
    Impartiality
    Incorporation Of Societies
    Independence And Impartiality
    Infectious Diseases Act 1988
    Initial Costs
    Intan Payong Sdn Bhd V. Goh Saw Chan Sdn Bhd [2004]
    JKR Form
    KKM
    KLRCA
    Krell V Henry [1903]
    Li Ching Wing V Xuan Yi Xiong [2004]
    Limitation Act 1953
    Limitation (Amendment) Act 2018
    Liquidated Damages
    Lok Kok Beng V Loh Chiak Eong [2015] 7 CLJ 1008
    Long-Stop
    Loss & Expense
    Low & Associates) V Persatuan Kanak Kanak Spastik Selangor & Wilayah Persekutuan And Another Case [2021] MLJU 430
    Low & Associates) V Persatuan Kanak-Kanak Spastik Selangor & Wilayah Persekutuan And Another Case [2021] MLJU 430
    Masenang Sdn Bhd V Sabanilam Enterprise Sdn Bhd
    MBank (M) Bhd V Abdul Aziz Hassan & Ors [2010]
    MCO
    Mears V Costplan [2019] EWCA Civ 502
    MITI
    Mitigation
    MKN
    NEC Form
    Pacific Forest Industries Sdn Bhd V Lin Wen-Chih [2009]
    PAM
    PAM Advisory
    PAM Form
    PAM Mediation
    PAM-Mediation
    Party Autonomy
    Pathological Defects
    PCP V L3 [2019]1LNS1321
    Police Act 1967
    Postal Rule
    PPE
    Preliminaries
    Prolongation Costs
    Public Policy
    PWD Form
    Qimonda V Sediabena (2012)
    Recurrent Costs
    Renegotiation
    Retention-Money
    RIBA Form
    S.14 Malaysian Arbitration Act 2005
    S.15 – 16 Civil Law Act 1956 CLA
    S.22 Arbitration Act 2005
    S.57(2) CA 1950
    S.70(21)SBDA1974
    Saga Fire Engineering V Lee Yee Seng [2017]
    SBDA 1974
    Schedule Of Rates
    Seat
    Selvakumar Vs Thiagarajah
    Serving Of Notice
    Sharikat Ying Mui Sdn Bhd V Hoh Kiang Po [2015]
    SK M&E Bersekutu V Pembinaan Legenda Unggul (2019)
    Skyworld Development Sdn Bhd V. Zalam Corporation Sdn Bhd & Other Cases. [2019]
    Societies Act 1966
    SOPL
    Standard Form Of Building Contract
    Statute Of Limitation
    Sutcliffe V Thackrah [1974]
    Temporary Measures For Reducing The Impact Of Coronavirus Disease 2019 (COVID 19)
    Temporary Measures For Reducing The Impact Of Coronavirus Disease 2019 (COVID-19)
    The Ara Joint Management Body V Mammoth Land & Development Sdn Bhd [2017]
    Trust Law
    UBBL 1984
    UK's Limitation Act 1980
    Ultra Vires
    VP
    Warranty
    Working Days

    RSS Feed

Powered by Create your own unique website with customizable templates.
  • Home
  • About
    • Professional Registration
    • Qualifications
    • Engagements
    • Private Practice
    • SIF Fellows
  • Practice
    • Our Approach >
      • S:Scale [Artefacts]
      • M:Scale [Building]
      • L:Scale [Urban]
    • Large Projects >
      • Highrises >
        • SSM International School
        • JBio
        • UKIH
        • Vertigo Residency
        • Diorama
        • Resi-Hub
        • SunMed
        • Medini
        • Palmspring Damansara
        • Blink
      • Lowrises >
        • Data Center
        • Garden Homes
        • XIN
        • Albient
        • Hillcourt
    • Small Projects >
      • Rustic Raphsody
      • MCM >
        • Estate House
        • Uniform Annex
        • Kitchen Extension
        • Sixth Form Center
      • Putrajaya Boulevard >
        • LOO
        • BOO
        • DOO
        • 5 Elements Tower
      • Detached Houses >
        • Batu Residence
        • Malaqa Residence
        • ParkCity Residence
        • Sierramas Residence
      • Commercial >
        • Albion Club
        • QuanYuan
        • Nippon Go
    • Interior Designs >
      • Spartan Minimalism
      • Neo Retro
      • Reflective Modern
    • UBBL 1984
    • Newsletter
  • DYA + C
    • Our CV
    • Adjudication >
      • CIPAA Procedure >
        • Scope of CIPAA
    • Arbitration >
      • Appointment of Arbitrator >
        • Terms of Appointment >
          • Preliminary Meeting Agenda
      • PAM Arbitration Procedure
      • Arbitration Costs Breakdowns >
        • Drawdown
      • Award Writing Blog >
        • Expert Evidence in Arbitration
    • Mediation >
      • Appointment of Mediator
      • Mediation Process
      • Skill Set Lev 01 & 02
    • Expert Determination >
      • Expert Rules - PAM
      • Expert Determination Processes
    • Building Inspection Services
    • Courses & Training >
      • Contract Administration
    • ADR & Construction Law
  • Consultant
    • QuanYuan 泉緣 Story
    • Review
    • QuanYuan >
      • Why QuanYuan?
      • Modus Operandi
      • Consultancy Services
    • Our Lineage
    • Workshop >
      • Teacher's Profiles
      • Message
      • SanYuan 01 - Introduction
      • Community
      • Registration of Interest
    • QiMen DunJia 奇門遁甲 >
      • QMDJ - Shifting Palace
    • Audit & Cases >
      • Cases - REA Hotel
      • Cases - Childless Couple
      • Cases - Childless Couple 02
    • Yifengshui
    • Newsletter >
      • MBS FengShui Reinvestigated
    • FAQ
    • E-Store
  • Educator
    • Author I am...
    • Speaking Engagement >
      • International Contract
      • PAM cpd UNLIMITED 2.0
      • Arch Edu Practice Paper - 3Ds Pedagogy
    • Attempting Law School
    • Journey in USM(Arch) >
      • Thesis >
        • Site Analysis
        • Urban Design Approach
        • Sketch Design
        • Model Based Paradigm
        • Technical Studies
      • Studio 01
      • Studio 02
    • Discourse in Studio 6 >
      • Ideation
      • The Production Model >
        • The Actors
        • The Stage
        • Urban Mass
        • The Box
        • The Play
        • The Break
        • The Newsletter
        • The Document
        • The Presentation
    • d:KON 4 >
      • Actors >
        • Chua LiCheng
        • Ng KenHong
        • Sean Tan
        • Peggy Chai
        • Elliotte Teoh
        • Vincent Tow
        • TzeLer
        • Elaine
        • Ng SongChun
        • Carissa Foong
        • Ng WeiMun
        • Ng ChenYin
        • Nicol Ong
        • Adron Liang
        • Ivan Sung
        • Lau HuiJew
      • Acts >
        • Portraiture
        • A Slice of Space Time
        • Box of Installation of Lights
        • Radio Misreading
        • Grid of Destinies
        • Shelter
        • Anatomy of Pain
        • Tensigrity of Ego
        • Of Prisons and Walls
        • Forest of Nails
        • Curtain of Fears
        • Dissolution of the Ego
        • If it's Ain't Broken it's Ain't Worth Mending
        • Flight of Freedom
        • Cross of Complexity and Contradiction
        • interrogation
      • Stage >
        • Soap Box
      • Play
      • Approach
      • Galleria >
        • Martial Gallery
        • Drive Through Gallery
        • Clinique Gallery
        • Cafe Gallery
        • MACC Gallery
        • Haunted Gallery
        • Backpacker Hotel
        • Audio Bookshop Gallery
        • Funeral Parlour
        • Extreme Game Gallery
        • Play Ground
        • Wedding Gallery
        • Meditation Gallery
        • Water Tower
        • Photography Studio
        • Chapel Gallery
    • External Critique >
      • Discourse in Sem 06
      • Discourse in Sem 05 >
        • The Site - KB
        • The Rectilinear
        • The Paired Kidneys
        • The Boat
        • The Decepticon
        • The Curvature
      • EnviroDesign MasterClass 2015
    • Philosophy
    • Codes Regulations & Standards >
      • Building Codes
      • Fire Codes
      • QAQC & Building Inspection
      • Critics
  • Photo Essays
    • Shanghai
    • Siemreap
  • Contact