DAVIDYEK
  • Home
  • About
    • Professional Registration
    • Qualifications
    • Engagements
    • Private Practice
    • SIF Fellows
  • Practice
    • Our Approach >
      • S:Scale [Artefacts]
      • M:Scale [Building]
      • L:Scale [Urban]
    • Large Projects >
      • Highrises >
        • SSM International School
        • JBio
        • UKIH
        • Vertigo Residency
        • Diorama
        • Resi-Hub
        • SunMed
        • Medini
        • Palmspring Damansara
        • Blink
      • Lowrises >
        • Data Center
        • Garden Homes
        • XIN
        • Albient
        • Hillcourt
    • Small Projects >
      • Rustic Raphsody
      • MCM >
        • Estate House
        • Uniform Annex
        • Kitchen Extension
        • Sixth Form Center
      • Putrajaya Boulevard >
        • LOO
        • BOO
        • DOO
        • 5 Elements Tower
      • Detached Houses >
        • Batu Residence
        • Malaqa Residence
        • ParkCity Residence
        • Sierramas Residence
      • Commercial >
        • Albion Club
        • QuanYuan
        • Nippon Go
    • Interior Designs >
      • Spartan Minimalism
      • Neo Retro
      • Reflective Modern
    • UBBL 1984
    • Newsletter
  • DYA + C
    • Our CV
    • Adjudication >
      • CIPAA Procedure >
        • Scope of CIPAA
    • Arbitration >
      • Appointment of Arbitrator >
        • Terms of Appointment >
          • Preliminary Meeting Agenda
      • PAM Arbitration Procedure
      • Arbitration Costs Breakdowns >
        • Drawdown
      • Award Writing Blog >
        • Expert Evidence in Arbitration
    • Mediation >
      • Appointment of Mediator
      • Mediation Process
      • Skill Set Lev 01 & 02
    • Expert Determination >
      • Expert Rules - PAM
      • Expert Determination Processes
    • Building Inspection Services
    • Courses & Training >
      • Contract Administration
    • ADR & Construction Law
  • Consultant
    • QuanYuan 泉緣 Story
    • Review
    • QuanYuan >
      • Why QuanYuan?
      • Modus Operandi
      • Consultancy Services
    • Our Lineage
    • Workshop >
      • Teacher's Profiles
      • Message
      • SanYuan 01 - Introduction
      • Community
      • Registration of Interest
    • QiMen DunJia 奇門遁甲 >
      • QMDJ - Shifting Palace
    • Audit & Cases >
      • Cases - REA Hotel
      • Cases - Childless Couple
      • Cases - Childless Couple 02
    • Yifengshui
    • Newsletter >
      • MBS FengShui Reinvestigated
    • FAQ
    • E-Store
  • Educator
    • Author I am...
    • Speaking Engagement >
      • International Contract
      • PAM cpd UNLIMITED 2.0
      • Arch Edu Practice Paper - 3Ds Pedagogy
    • Attempting Law School
    • Journey in USM(Arch) >
      • Thesis >
        • Site Analysis
        • Urban Design Approach
        • Sketch Design
        • Model Based Paradigm
        • Technical Studies
      • Studio 01
      • Studio 02
    • Discourse in Studio 6 >
      • Ideation
      • The Production Model >
        • The Actors
        • The Stage
        • Urban Mass
        • The Box
        • The Play
        • The Break
        • The Newsletter
        • The Document
        • The Presentation
    • d:KON 4 >
      • Actors >
        • Chua LiCheng
        • Ng KenHong
        • Sean Tan
        • Peggy Chai
        • Elliotte Teoh
        • Vincent Tow
        • TzeLer
        • Elaine
        • Ng SongChun
        • Carissa Foong
        • Ng WeiMun
        • Ng ChenYin
        • Nicol Ong
        • Adron Liang
        • Ivan Sung
        • Lau HuiJew
      • Acts >
        • Portraiture
        • A Slice of Space Time
        • Box of Installation of Lights
        • Radio Misreading
        • Grid of Destinies
        • Shelter
        • Anatomy of Pain
        • Tensigrity of Ego
        • Of Prisons and Walls
        • Forest of Nails
        • Curtain of Fears
        • Dissolution of the Ego
        • If it's Ain't Broken it's Ain't Worth Mending
        • Flight of Freedom
        • Cross of Complexity and Contradiction
        • interrogation
      • Stage >
        • Soap Box
      • Play
      • Approach
      • Galleria >
        • Martial Gallery
        • Drive Through Gallery
        • Clinique Gallery
        • Cafe Gallery
        • MACC Gallery
        • Haunted Gallery
        • Backpacker Hotel
        • Audio Bookshop Gallery
        • Funeral Parlour
        • Extreme Game Gallery
        • Play Ground
        • Wedding Gallery
        • Meditation Gallery
        • Water Tower
        • Photography Studio
        • Chapel Gallery
    • External Critique >
      • Discourse in Sem 06
      • Discourse in Sem 05 >
        • The Site - KB
        • The Rectilinear
        • The Paired Kidneys
        • The Boat
        • The Decepticon
        • The Curvature
      • EnviroDesign MasterClass 2015
    • Philosophy
    • Codes Regulations & Standards >
      • Building Codes
      • Fire Codes
      • QAQC & Building Inspection
      • Critics
  • Photo Essays
    • Shanghai
    • Siemreap
  • Contact

FIRE-REQUIREMENT [PART III] UBBL 2012 [SEL] & MS1183:2015

4/13/2021

0 Comments

 
Picture

FIRE-REQUIREMENT [PART III] UBBL 2012[SEL] & MS1183:2015

1] Purpose Group
2] Open Structures and Corridors
3] Fire Appliance Access
4] Travel Distances
5] Single Staircase Provisions


Picture

​PURPOSE GROUP

Amended to give a wider spectrum of inclusion as specified above to include modern typology of purpose group liked Hotels, Hospitals and Shopping complexes. 

Picture

OPEN STURCTURES AND CORRIDORS

“Openings” is to be opened to outside, unenclosed space or permitted air wells. Any individual opening having a surface area less than 600mmsq or area width of opening is less than 25mm is not to be regarded as an opening for this purpose.
  1. Total surface area of openings is to be no less than 40% of the total perimeter wall area enclosing the floor or compartment.
  2. The opening is to be shaped and located in such a way that total length in plan of the opening(s) is to be no less than 50% of the perimeter of the floor or compartment.

Picture

OPEN CORRIDOR

“Openings” is to be opened to outside, unenclosed space or permitted air wells. Any individual opening having a surface area less than 600mmsq or area width of opening is less than 25mm is not to be regarded as an opening for this purpose.
  1. Total surface area of opening(s) is to be no less than 25% of the total perimeter wall area enclosing the balcony (corridor).
  2. The opening(s) is to be shaped and located in such a way that total length in plan of the opening(s) is to be no less than 50% of the perimeter of the floor or compartment.

Picture
Picture
Picture
Picture
Picture

FIRE APPLIANCES PROVISIONS


Picture
Picture

APPLIANCES ACCESS UBBL:140

ACCESS WAY
An area for the entry, maneuvering and parking of Fire Appliances during fire fighting and rescue operations.

ACCESS ROAD
A road capable of accommodating the passage of Fire Appliances to enter an Access Way.

ACCESS OPENINGS
Doorways or openings that allows fast and safe entry of Fire Fighting and Rescue personnel into a building during fire fighting and rescue operations.

Picture
Picture
Picture
Picture

SYSTEMS


Picture

FIRE FIGHTING FROM THE EXTERNAL

Critiques: It is very naive to think that it is economically viable to locate all the Appliances within the level of ground floor where the rental rates are the highest! Alternatively, is to locate all the appliances on basement 1 (allowable) and having the Breeching outlet to rise up to ground floor and be accessible from the road level.

Picture

EXITS AND TRAVEL DISTANCE

What is meant by:

  1. Final exit:  may not necessary be Fire Rated Door as it exits to the Open Spaces. 
  2. ‘Alternative exits’
  3. Storey exit
  4. Horizontal exit
  5. Exit route
Picture
Critique: Note that the provision for running distance has been increased but the Occupancy Load has been decreased.
Picture
Picture
Picture

Picture

SINGLE STAIRCASE PROVISIONS

​Critique: Selangor only allows Residential unit above and Shop below to fall under this provision with the max storeys of 2. Shop office shall not fall under this provision and required 2 escape staircases.
0 Comments



Leave a Reply.

    Related Institutions:

    Picture
    https://www.ife.org.uk/

    Objective of this Page:

    I am contributing to the public information regarding the application of Fire Codes in the Design for Fire Safety that has been the core competency of Architects, in general. These information is for educational purpose only and shall not be taken as an advice be it legal or otherwise. You should seek proper advice to your case with the relevant professionals. The author cannot guarantee the accuracy of the information so provided here.

    Archives

    April 2021
    July 2020
    June 2020

    Categories

    All
    Atrium
    Compartment
    External Fire Fighting
    Fire Codes
    Internal Escape
    MS1183:2015
    [PART III] UBBL 2012[SEL]
    S.137 UBBL 1984
    S.137 UBBL 2012
    S.140(4)UBBL
    S.252A UBBL 2012
    UBBL

    RSS Feed

Powered by Create your own unique website with customizable templates.
  • Home
  • About
    • Professional Registration
    • Qualifications
    • Engagements
    • Private Practice
    • SIF Fellows
  • Practice
    • Our Approach >
      • S:Scale [Artefacts]
      • M:Scale [Building]
      • L:Scale [Urban]
    • Large Projects >
      • Highrises >
        • SSM International School
        • JBio
        • UKIH
        • Vertigo Residency
        • Diorama
        • Resi-Hub
        • SunMed
        • Medini
        • Palmspring Damansara
        • Blink
      • Lowrises >
        • Data Center
        • Garden Homes
        • XIN
        • Albient
        • Hillcourt
    • Small Projects >
      • Rustic Raphsody
      • MCM >
        • Estate House
        • Uniform Annex
        • Kitchen Extension
        • Sixth Form Center
      • Putrajaya Boulevard >
        • LOO
        • BOO
        • DOO
        • 5 Elements Tower
      • Detached Houses >
        • Batu Residence
        • Malaqa Residence
        • ParkCity Residence
        • Sierramas Residence
      • Commercial >
        • Albion Club
        • QuanYuan
        • Nippon Go
    • Interior Designs >
      • Spartan Minimalism
      • Neo Retro
      • Reflective Modern
    • UBBL 1984
    • Newsletter
  • DYA + C
    • Our CV
    • Adjudication >
      • CIPAA Procedure >
        • Scope of CIPAA
    • Arbitration >
      • Appointment of Arbitrator >
        • Terms of Appointment >
          • Preliminary Meeting Agenda
      • PAM Arbitration Procedure
      • Arbitration Costs Breakdowns >
        • Drawdown
      • Award Writing Blog >
        • Expert Evidence in Arbitration
    • Mediation >
      • Appointment of Mediator
      • Mediation Process
      • Skill Set Lev 01 & 02
    • Expert Determination >
      • Expert Rules - PAM
      • Expert Determination Processes
    • Building Inspection Services
    • Courses & Training >
      • Contract Administration
    • ADR & Construction Law
  • Consultant
    • QuanYuan 泉緣 Story
    • Review
    • QuanYuan >
      • Why QuanYuan?
      • Modus Operandi
      • Consultancy Services
    • Our Lineage
    • Workshop >
      • Teacher's Profiles
      • Message
      • SanYuan 01 - Introduction
      • Community
      • Registration of Interest
    • QiMen DunJia 奇門遁甲 >
      • QMDJ - Shifting Palace
    • Audit & Cases >
      • Cases - REA Hotel
      • Cases - Childless Couple
      • Cases - Childless Couple 02
    • Yifengshui
    • Newsletter >
      • MBS FengShui Reinvestigated
    • FAQ
    • E-Store
  • Educator
    • Author I am...
    • Speaking Engagement >
      • International Contract
      • PAM cpd UNLIMITED 2.0
      • Arch Edu Practice Paper - 3Ds Pedagogy
    • Attempting Law School
    • Journey in USM(Arch) >
      • Thesis >
        • Site Analysis
        • Urban Design Approach
        • Sketch Design
        • Model Based Paradigm
        • Technical Studies
      • Studio 01
      • Studio 02
    • Discourse in Studio 6 >
      • Ideation
      • The Production Model >
        • The Actors
        • The Stage
        • Urban Mass
        • The Box
        • The Play
        • The Break
        • The Newsletter
        • The Document
        • The Presentation
    • d:KON 4 >
      • Actors >
        • Chua LiCheng
        • Ng KenHong
        • Sean Tan
        • Peggy Chai
        • Elliotte Teoh
        • Vincent Tow
        • TzeLer
        • Elaine
        • Ng SongChun
        • Carissa Foong
        • Ng WeiMun
        • Ng ChenYin
        • Nicol Ong
        • Adron Liang
        • Ivan Sung
        • Lau HuiJew
      • Acts >
        • Portraiture
        • A Slice of Space Time
        • Box of Installation of Lights
        • Radio Misreading
        • Grid of Destinies
        • Shelter
        • Anatomy of Pain
        • Tensigrity of Ego
        • Of Prisons and Walls
        • Forest of Nails
        • Curtain of Fears
        • Dissolution of the Ego
        • If it's Ain't Broken it's Ain't Worth Mending
        • Flight of Freedom
        • Cross of Complexity and Contradiction
        • interrogation
      • Stage >
        • Soap Box
      • Play
      • Approach
      • Galleria >
        • Martial Gallery
        • Drive Through Gallery
        • Clinique Gallery
        • Cafe Gallery
        • MACC Gallery
        • Haunted Gallery
        • Backpacker Hotel
        • Audio Bookshop Gallery
        • Funeral Parlour
        • Extreme Game Gallery
        • Play Ground
        • Wedding Gallery
        • Meditation Gallery
        • Water Tower
        • Photography Studio
        • Chapel Gallery
    • External Critique >
      • Discourse in Sem 06
      • Discourse in Sem 05 >
        • The Site - KB
        • The Rectilinear
        • The Paired Kidneys
        • The Boat
        • The Decepticon
        • The Curvature
      • EnviroDesign MasterClass 2015
    • Philosophy
    • Codes Regulations & Standards >
      • Building Codes
      • Fire Codes
      • QAQC & Building Inspection
      • Critics
  • Photo Essays
    • Shanghai
    • Siemreap
  • Contact